Monday, April 1st, the hall makeover! Actually, everything was already set up. Just need a few touch up. We need to bring down the photocopier, fax machine, test the LCD, set-up the printers etc, etc.

Besides all those machines and IT stuff, I had to arrange the table tags based on the current number of buyers. As of Friday, there were still withdrawals from the buyers and the number kept on increasing. I have pulled out the kits for that matter.

However, on Monday, we were informed by the LogComms that they (the withdraw buyers) checked-in the hotel. Say what?? It was fortunate that I didn't pull out any of the seatings. *phew*

The Hall Makeover: Registration Counter and Hanging Signages.

The banquet chairs added from our store.

Even though we outsourced the hanging signage, we made changes to the places.

Just an act!


That's the true guy behind hanging signages but we intend to interframe with his work.

This was the most tiring task. Hanging up meeting schedules all over the hall.

 My feet was in so much pain that it left the shoes behind.

So much better not having to walk.

Ta-Da! Meeting Venue Done and Ready for Full Blast!
We went home at 10.30pm after we were chased off by the Facility Management.